Exciting times as construction progresses at 456 Burwood Highway, Wantirna South. The following work has been carried out thus far:
Level 3-5 Suspended Slab: 100%
Townhouse Framing: 40%
Basement Rough In: 50%
Ground Rough In: 70%
Level 1 Rough In: 20%
Level 2 Rough In: 10%
Structural Blockwork: 90%
Ground Floor Window Frames: 50%
Construction images can be viewed via the link below: